DHG Smartlog
An 11 MWp rooftop array across two logistics roofs in Rotterdam, we built the DC side.
11 MWp across 10,444 panels and 100,000 m² of logistics rooftop, built for performance.
On the DHG Smartlog 8 & 9 logistics facilities in Rotterdam, our partner Generation Green developed a vast rooftop array: 10,444 Longi Solar 530 Wp panels spanning roughly 100,000 m² of roof, for 11 MWp of installed capacity (5.535 MW maximum output) and an EMS-managed connection. The system produces around 4,974,200 kWh a year, equal to the power needs of about 3,142 households, or 300 electric trucks, every year.
Green Teams Europe delivered the DC-side construction of the installation (the panels, string layout and DC wiring that form the heart of the array) installed across both roofs to the highest safety and quality standards.
What we did: DC construction
- Mechanical mounting and panel installation across 100,000 m² of rooftop
- String layout and complete DC wiring to the inverters
- Coordinated delivery across two facilities (Smartlog 8 & 9)
- Safety-first execution with clean as-built documentation